Longhua Cultural and Sports Center Project
Longhua Cultural and Sports Center Project
Longhua Cultural and Sports Center Project

This project is located in the business center district of Shenzhen North Railway Station. In the development of the new urban area, it has multiple functions such as culture and art. Among them, the new Shenzhen Art Museum is positioned as a large-scale modern, international and digital comprehensive art museum integrating collection, exhibition, research, exchange, education and promotion. The adjustment book depository of Shenzhen Library is positioned as a fundamental supporting project for the construction of Shenzhen as a "City of Libraries" and an important resource platform for Shenzhen as a "Global Model City for Universal Reading", with over 1,000 reading seats.


The Shenzhen Art Museum serves as a window for showcasing art, a platform for promoting interaction and exchange between Chinese art and international art, a venue for aesthetic education to the public and enriching citizens' culture, and a key area for advancing the development of contemporary art. The Second Library serves as a window to showcase the cultural development process and future construction of Shenzhen, a starting point connecting the present and the future, and a platform for cultural and academic exchanges in Shenzhen.


The company's BIM technology team has been involved since the scheme stage, cooperating with the design team to use 3D models for auxiliary design work. Through BIM technology, they have successively completed auxiliary scheme design, building performance analysis, spatial analysis, pipeline integration, and deepening of seismic support hangers, etc., helping to improve the quality of design drawings.


Secondly, there are four major links: formulating project-level BIM implementation standards, reviewing the quality of results and organizing coordination, and promoting progress. So far, the Whole-process Consulting Department has completed the compilation of one BIM planning scheme, five BIM implementation standard documents, five management processes, seven management systems and related safeguard measures.


Thirdly, the Longhua Two Museums project, as one of the new top ten cultural buildings in Shenzhen, aims to build a high-quality project. To showcase the innovative application of BIM technology in the design stage of this project, facilitate the promotion of BIM technology application, and enhance the project and enterprise's reputation, the Jiangnan Whole Process Consulting Department, in collaboration with the project team of the Public Works Bureau, the Zhubo Design Institute, and the construction unit, the First Company of China Construction Third Engineering Bureau, have jointly planned and proposed to apply for the 11th "Innovation Cup" competition hosted by the China Association of Surveying, Design and Consulting in 2020.


The main highlights of BIM technology application include:


In the early stage of the plan, when analyzing the clear height of the stairwell by creating a civil engineering model, it was found that the clear height of the double-run staircase was insufficient, which would cause a collision. After several discussions with the plan unit, it was finally confirmed to modify the staircase form, add steps and intermediate transition platforms to solve the problem of insufficient clear height.


It took a full year from the proposal to the preliminary design stage. Based on the key and difficult points of this project, a comprehensive professional review was organized. At the same time, a preliminary estimate of the clear height required by the library was made. During this period, 724 items were proposed for review, among which 450 errors, omissions, collisions and deficiencies among different specialties were solved through BIM-based technical optimization, accounting for approximately 62%.


3. To maximize resource conservation, environmental protection and pollution reduction, the analysis of wind, light, sound and heat indicators inside and outside the building is carried out during the scheme design stage, which serves as a reference basis for applying for green and energy-saving buildings.


4. During the construction drawing design stage, based on the design deepening model, pipe integration collision checks are conducted to resolve design issues and those unfavorable to construction before the official start of the project, thereby reducing changes and rework during the construction process.


5. Compared with the original design structure, trusses were added to the exhibition hall of the collections on the 4th floor of the art museum. After the BIM team optimized the route of the HVAC return air system and readjusted the piping system, they found that the clear height could meet the requirements of the museum. Therefore, the BIM team suggested that the building wall originally planned to be used to hide the air conditioning ducts on this floor could be cancelled. After the cancellation, the usable area of the exhibition hall can be increased by 36 square meters. This deepening suggestion was recognized by the architectural professional engineer and was drawn.


6. When the BIM team conducts pipeline integration during the construction drawing design stage, they take into account the issue of setting seismic supports and hangers during construction. They require in-depth design of seismic supports and hangers, technical communication with the manufacturer, clarification of the parameter dimensions of seismic supports and hangers, and construction of the parameter family of seismic supports and hangers. In the pipe integration model, seismic supports and hangers are laid out in accordance with the construction requirements. In this way, the possible insufficient space for the laying of seismic supports and hangers at the construction site in the later stage can be discovered, and the maintenance space after the construction is completed and put into use can be reserved to improve the space utilization rate.


7. Based on the BIM model and the space requirements of the museum, conduct a clear height analysis. Through the model, analyze the factors that affect the clear height of important areas such as the lecture hall, exhibition hall, and public corridors, such as the size of fireproof rolling shutters and the installation space for supports and hangers. After organizing a special meeting for discussion, optimize the elevation and layout of pipelines such as air ducts, cable trays, and water pipes Make the clear height of each floor's rooms meet the requirements of the users.


8. We conducted a meticulous review of the design model (process version), optimized 351 model issues, and formed 11 review reports. This assisted the design BIM team in improving the model, fully leveraging the role of the BIM team in the whole-process consulting department to facilitate the smooth handover of the design BIM model to the general contractor for construction.


9. The design model management integration coordination meeting was organized and held. The meeting discussed and made suggestions on the drawing and model issues identified by the management integration layout of the Zhubo Design BIM team, and resolved a large number of coordination and communication problems, smoothly advancing the progress of design BIM. After the meeting, a BIM professional issue implementation tracking table was also formed.


10. Utilize the design BIM model to conduct statistics on the engineering quantity of prefabricated steel structure components, which serves as a reference for the in-depth processing of steel structures. The steel components of this project mainly use welded non-special-shaped section steel, and the floor slabs adopt reinforced truss floor deck slabs without formwork support. Through BIM technology, the hoisting construction process of prefabricated steel structures is simulated, the hoisting construction plan of steel structures is analyzed and optimized, and finally a simulation video and analysis report are formed to guide on-site construction.


  • Service Content

    BIM consulting

  • Project location:

    Shenzhen City, Guangdong Province

  • Construction unit:

    China Resources (Shenzhen) Limited

主站蜘蛛池模板: 欧美风情第一页| 破处一级片| 97超碰在线人人| 91色拍| 摸进她内裤里疯狂揉她的| 插插射射| 少妇精品无码一区二区免费视频| 美女张开腿露出尿口| 久久精品—区二区三区舞蹈| 国产性自拍| 欧美成人免费在线视频| 久久影院免费观看| 三上悠亚 在线播放| 性感美女福利视频| 岛国一区二区三区| 精品国产乱码一区二区三区| 91黄色小网站| 亚洲欧美一区二区三区久久| 无码精品人妻一区二区三区影院| 黄网在线看| 毛片基地站| 初尝性事无删减版| 玖草视频在线观看| 日本日韩欧美| 黄色视屏软件| 国产精品50页| 成年人免费视频观看| 91超碰在线观看| 日日操夜夜草| 牛牛电影国产一区二区| 玖玖在线资源| 香蕉久久夜色精品| 两个裸男脱了内裤视频| 国产108页| 亚洲欧美网站| 亚洲xxx在线| 欧洲av一区二区三区| 亚洲区一区| 美女爱爱视频| 91网在线播放| 日批免费网站| 一区在线观看视频| 成年人看的视频网站| 有色视频在线观看| 人人澡人人射| 视频网站在线观看18| 成熟亚洲日本毛茸茸凸凹| 久久久视屏| 特黄aaaaaaaaa真人毛片| 男女后式激烈动态图片| 久久国产视频一区| 97毛片| 教室脔到她哭h粗话h好爽视频| 99有精品| 波多野结衣有码| 欧美日韩黄色| 夜夜爽爽爽| 67194少妇| 亚洲色中色| 在线午夜电影| 成人看片在线观看| 男的操女的视频| 精品国产青草久久久久96| 第四色激情| 国产原创在线观看| 青草成人免费视频| 影音先锋影院| 护士被强伦在线播放2| 亚洲精品女同| 人妻巨大乳hd免费看| 国产精品三| 欧美乱仑视频| 爱爱视频天天干| 亚洲一区自拍| 久久新网址| 呦呦视频在线观看| 天天做天天爽| 骚年操老头| 欧美少妇一区| 曰本在线| 另类激情亚洲| 中文字幕在线日本| 一片毛片| 成人黄色a| 欧美成人精品欧美一级私黄| 国产a级全部精品| 亚洲你我色| 在线你懂| 激情网站网址| 欧美全黄| 狠狠干夜夜爱| 三上悠亚高清| 波多野结衣在线一区| 国产夫妻一区| 欧洲美熟女乱又伦av影片| 五月婷在线| 午夜免费网| 日本污污网站| 欧美日韩在线直播|